one.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany sort can be opentional |
tire | 11R22.five/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./8./8.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
device box | 1 |
air wiring | doule air line |
electricity wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting machine lower the steel to minor parts use for suitable welding and splicing
two)welding
following metal chopping procedure the following phase is welding .this approach the principal function is beam welding .the best plate-bottom plate and the
middle plate will be welding collectively . this approach will be use submerged arc welding approach.this type of welding is very
particular .its solely utilised in I beam welding .right after this welding approach other components of the trailer will be use various welding way
for diverse steel-argon arc welding-electric arc welding-manual welding-fuel welding and so on
three)blasting
this method is use for the very first step of surface area cleanness-pressure reduction-derusting just before paiting .
four)electrophoresis coating
this process use for much more detail surface cleanness
five)epoxy zinc primer spray coating
this approach is the long lasting one particular ahead of paiting .soon after this method the trailer an be paiting
6)assembly
after all the process we have mationed .the final treatment of the trailer is assembly.this procedure all the parts will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake program and so on
7)packing
The final process is packing .all the trailer use various packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer