1.Item parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany variety can be opentional |
tire | 11R22.5/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/9./eight./eight.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | 1 |
air wiring | doule air line |
electrical power wiring | 6 main wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma chopping equipment cut the metal to tiny parts use for ideal welding and splicing
2)welding
soon after steel reducing approach the subsequent stage is welding .this procedure the primary perform is beam welding .the top plate-bottom plate and the
middle plate will be welding together . this method will be use submerged arc welding approach.this variety of welding is really
specific .its exclusively utilized in I beam welding .following this welding method other areas of the trailer will be use different welding way
for diverse steel-argon arc welding-electric powered arc welding-manual welding-gas welding and so on
3)blasting
this approach is use for the very first step of floor cleanness-tension reduction-derusting just before paiting .
four)electrophoresis coating
this process use for more detail surface area cleanness
5)epoxy zinc primer spray coating
this process is the lasting 1 ahead of paiting .following this process the trailer an be paiting
six)assembly
after all the procedure we have mationed .the final treatment of the trailer is assembly.this method all the elements will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake system and so on
seven)packing
The very last approach is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer