one.Product parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany kind can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./8./eight.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | one |
air wiring | doule air line |
electrical power wiring | six core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing machine minimize the steel to little elements use for appropriate welding and splicing
2)welding
after steel cutting procedure the up coming stage is welding .this approach the main perform is beam welding .the best plate-base plate and the
middle plate will be welding with each other . this method will be use submerged arc welding process.this variety of welding is quite
particular .its exclusively employed in I beam welding .after this welding method other elements of the trailer will be use various welding way
for diverse steel-argon arc welding-electrical arc welding-handbook welding-gas welding and so on
three)blasting
this approach is use for the 1st action of surface cleanness-pressure aid-derusting just before paiting .
four)electrophoresis coating
this procedure use for a lot more element surface cleanness
5)epoxy zinc primer spray coating
this process is the lasting one particular before paiting .after this process the trailer an be paiting
six)assembly
following all the approach we have mationed .the final method of the trailer is assembly.this procedure all the parts will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake technique and so on
7)packing
The previous process is packing .all the trailer use various packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer