one.Merchandise parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany type can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./eight./eight.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | one |
air wiring | doule air line |
electricity wiring | 6 core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma reducing machine minimize the metal to small elements use for appropriate welding and splicing
two)welding
soon after steel reducing approach the subsequent step is welding .this procedure the principal work is beam welding .the prime plate-base plate and the
middle plate will be welding together . this procedure will be use submerged arc welding procedure.this kind of welding is extremely
specific .its exclusively used in I beam welding .soon after this welding approach other parts of the trailer will be use distinct welding way
for different metal-argon arc welding-electrical arc welding-manual welding-gas welding and so on
3)blasting
this procedure is use for the first phase of area cleanness-stress relief-derusting ahead of paiting .
4)electrophoresis coating
this procedure use for far more depth floor cleanness
5)epoxy zinc primer spray coating
this process is the lasting one particular before paiting .after this process the trailer an be paiting
six)assembly
right after all the approach we have mationed .the last treatment of the trailer is assembly.this procedure all the components will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake program and so on
7)packing
The last process is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer