1.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany sort can be opentional |
tire | 11R22.5/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./eight./8.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | one |
air wiring | doule air line |
electrical power wiring | six core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma slicing machine reduce the steel to small elements use for suited welding and splicing
two)welding
soon after steel reducing approach the up coming action is welding .this approach the principal work is beam welding .the top plate-base plate and the
middle plate will be welding jointly . this process will be use submerged arc welding procedure.this kind of welding is really
particular .its exclusively employed in I beam welding .soon after this welding procedure other elements of the trailer will be use different welding way
for different metal-argon arc welding-electrical arc welding-guide welding-fuel welding and so on
three)blasting
this approach is use for the 1st step of surface area cleanness-stress reduction-derusting before paiting .
four)electrophoresis coating
this procedure use for more detail surface area cleanness
5)epoxy zinc primer spray coating
this process is the long lasting one particular prior to paiting .after this process the trailer an be paiting
six)assembly
right after all the procedure we have mationed .the final procedure of the trailer is assembly.this method all the parts will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake system and so on
7)packing
The very last procedure is packing .all the trailer use distinct packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer