one.Merchandise parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/nine./eight./eight.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | one |
air wiring | doule air line |
electricity wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma chopping device cut the metal to little parts use for appropriate welding and splicing
two)welding
following metal slicing procedure the next step is welding .this procedure the major operate is beam welding .the prime plate-bottom plate and the
middle plate will be welding jointly . this method will be use submerged arc welding approach.this sort of welding is very
special .its solely used in I beam welding .soon after this welding process other areas of the trailer will be use different welding way
for different metal-argon arc welding-electric powered arc welding-guide welding-gasoline welding and so on
three)blasting
this procedure is use for the initial phase of area cleanness-pressure reduction-derusting before paiting .
four)electrophoresis coating
this procedure use for much more depth surface cleanness
five)epoxy zinc primer spray coating
this procedure is the long lasting one prior to paiting .right after this approach the trailer an be paiting
6)assembly
following all the process we have mationed .the very last process of the trailer is assembly.this procedure all the elements will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake technique and so on
7)packing
The previous approach is packing .all the trailer use different packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer