one.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany type can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./8./8.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | 1 |
air wiring | doule air line |
electrical power wiring | six core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting equipment cut the steel to little elements use for appropriate welding and splicing
two)welding
right after steel reducing approach the subsequent action is welding .this procedure the major work is beam welding .the leading plate-base plate and the
middle plate will be welding with each other . this process will be use submerged arc welding procedure.this type of welding is very
special .its completely utilized in I beam welding .right after this welding procedure other elements of the trailer will be use various welding way
for various metal-argon arc welding-electrical arc welding-manual welding-gas welding and so on
3)blasting
this method is use for the very first step of surface area cleanness-pressure relief-derusting prior to paiting .
4)electrophoresis coating
this process use for far more detail area cleanness
5)epoxy zinc primer spray coating
this approach is the lasting a single just before paiting .following this approach the trailer an be paiting
6)assembly
right after all the process we have mationed .the previous procedure of the trailer is assembly.this procedure all the components will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
7)packing
The final procedure is packing .all the trailer use different packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer