1.Solution parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany kind can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/9./eight./8.5 |
kingpin | two”/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | 1 |
air wiring | doule air line |
electricity wiring | six core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting device minimize the steel to minor elements use for ideal welding and splicing
2)welding
right after metal reducing method the up coming step is welding .this approach the primary perform is beam welding .the best plate-bottom plate and the
middle plate will be welding with each other . this procedure will be use submerged arc welding approach.this sort of welding is very
special .its completely used in I beam welding .right after this welding approach other elements of the trailer will be use diverse welding way
for diverse steel-argon arc welding-electrical arc welding-guide welding-fuel welding and so on
three)blasting
this procedure is use for the very first action of area cleanness-stress aid-derusting prior to paiting .
four)electrophoresis coating
this procedure use for more detail surface area cleanness
five)epoxy zinc primer spray coating
this method is the lasting a single just before paiting .after this approach the trailer an be paiting
6)assembly
right after all the process we have mationed .the last process of the trailer is assembly.this procedure all the elements will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
seven)packing
The previous procedure is packing .all the trailer use diverse packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer