1.Merchandise parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany variety can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./eight./eight.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | 1 |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma chopping equipment reduce the metal to small parts use for suited welding and splicing
2)welding
right after steel chopping procedure the next phase is welding .this method the principal work is beam welding .the top plate-base plate and the
middle plate will be welding together . this procedure will be use submerged arc welding approach.this sort of welding is extremely
special .its completely utilised in I beam welding .right after this welding procedure other components of the trailer will be use diverse welding way
for diverse metal-argon arc welding-electrical arc welding-guide welding-fuel welding and so on
three)blasting
this process is use for the 1st step of floor cleanness-stress relief-derusting before paiting .
four)electrophoresis coating
this procedure use for more depth floor cleanness
five)epoxy zinc primer spray coating
this procedure is the lasting one ahead of paiting .following this method the trailer an be paiting
six)assembly
right after all the procedure we have mationed .the last method of the trailer is assembly.this method all the areas will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake system and so on
7)packing
The final process is packing .all the trailer use distinct packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer