1.Product parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany type can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/9./eight./8.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | one |
air wiring | doule air line |
electrical energy wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing device reduce the metal to small areas use for suitable welding and splicing
2)welding
right after steel slicing method the following phase is welding .this approach the main operate is beam welding .the prime plate-bottom plate and the
middle plate will be welding together . this process will be use submerged arc welding approach.this sort of welding is very
specific .its solely employed in I beam welding .right after this welding process other parts of the trailer will be use various welding way
for distinct steel-argon arc welding-electric powered arc welding-handbook welding-gas welding and so on
3)blasting
this procedure is use for the first stage of floor cleanness-pressure relief-derusting before paiting .
four)electrophoresis coating
this approach use for a lot more detail floor cleanness
5)epoxy zinc primer spray coating
this method is the lasting one ahead of paiting .following this approach the trailer an be paiting
six)assembly
after all the process we have mationed .the previous procedure of the trailer is assembly.this approach all the components will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake technique and so on
seven)packing
The final method is packing .all the trailer use distinct packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer