1.Product parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany sort can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/9./8./8.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | one |
air wiring | doule air line |
electric power wiring | 6 main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma slicing equipment minimize the steel to small components use for suitable welding and splicing
2)welding
soon after metal slicing method the up coming phase is welding .this approach the primary function is beam welding .the leading plate-bottom plate and the
middle plate will be welding jointly . this process will be use submerged arc welding process.this variety of welding is quite
special .its exclusively used in I beam welding .right after this welding procedure other parts of the trailer will be use various welding way
for diverse steel-argon arc welding-electric arc welding-manual welding-gas welding and so on
three)blasting
this procedure is use for the first action of floor cleanness-anxiety aid-derusting just before paiting .
four)electrophoresis coating
this procedure use for more element surface cleanness
five)epoxy zinc primer spray coating
this approach is the long lasting 1 ahead of paiting .after this method the trailer an be paiting
6)assembly
after all the procedure we have mationed .the last method of the trailer is assembly.this process all the elements will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake program and so on
seven)packing
The very last method is packing .all the trailer use different packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer