one.Solution parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany type can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./eight./eight.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
device box | 1 |
air wiring | doule air line |
electric power wiring | six core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma chopping equipment minimize the steel to tiny parts use for appropriate welding and splicing
2)welding
right after steel reducing approach the next action is welding .this procedure the principal perform is beam welding .the prime plate-bottom plate and the
middle plate will be welding with each other . this procedure will be use submerged arc welding process.this sort of welding is extremely
special .its exclusively utilised in I beam welding .following this welding method other areas of the trailer will be use different welding way
for diverse steel-argon arc welding-electrical arc welding-manual welding-fuel welding and so on
3)blasting
this process is use for the first stage of floor cleanness-anxiety aid-derusting ahead of paiting .
4)electrophoresis coating
this process use for much more detail surface cleanness
5)epoxy zinc primer spray coating
this process is the lasting a single before paiting .following this procedure the trailer an be paiting
6)assembly
following all the method we have mationed .the very last treatment of the trailer is assembly.this approach all the elements will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake technique and so on
7)packing
The previous procedure is packing .all the trailer use various packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer