one.Merchandise parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany sort can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./eight.5 |
kingpin | two”/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | 1 |
air wiring | doule air line |
electrical power wiring | six core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting device lower the metal to minor areas use for suited welding and splicing
2)welding
after metal chopping method the following action is welding .this method the primary function is beam welding .the best plate-bottom plate and the
middle plate will be welding collectively . this process will be use submerged arc welding procedure.this kind of welding is quite
unique .its exclusively utilized in I beam welding .soon after this welding procedure other elements of the trailer will be use different welding way
for distinct metal-argon arc welding-electric powered arc welding-guide welding-fuel welding and so on
3)blasting
this procedure is use for the 1st step of floor cleanness-pressure relief-derusting before paiting .
4)electrophoresis coating
this method use for more depth surface cleanness
five)epoxy zinc primer spray coating
this approach is the lasting one particular just before paiting .after this method the trailer an be paiting
6)assembly
soon after all the process we have mationed .the very last process of the trailer is assembly.this method all the parts will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on
7)packing
The last process is packing .all the trailer use distinct packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer