one.Merchandise parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany type can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/nine./8./eight.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | 1 |
air wiring | doule air line |
electrical energy wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma cutting machine cut the metal to minor areas use for ideal welding and splicing
2)welding
soon after steel cutting approach the following action is welding .this process the primary operate is beam welding .the best plate-base plate and the
middle plate will be welding with each other . this method will be use submerged arc welding approach.this sort of welding is very
specific .its completely employed in I beam welding .soon after this welding procedure other elements of the trailer will be use different welding way
for distinct metal-argon arc welding-electric powered arc welding-guide welding-fuel welding and so on
3)blasting
this process is use for the first stage of surface cleanness-pressure reduction-derusting before paiting .
4)electrophoresis coating
this procedure use for far more depth surface area cleanness
five)epoxy zinc primer spray coating
this approach is the lasting a single before paiting .soon after this method the trailer an be paiting
six)assembly
following all the approach we have mationed .the very last treatment of the trailer is assembly.this process all the components will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on
seven)packing
The last method is packing .all the trailer use distinct packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer