3 Axle Lowboy/Lower Deck/Minimal Bed Semi Truck Trailer for Sale 3/4axles forty five-sixty Tons Low-Mattress JCPT Gear Lowbed Truck Semi Trailer
Major Efficiency
Solution Specification | ||||
one | Sort | Semitrailer | ||
two | Solution Identify | Reduced Bed Semitrailer | ||
3 | Dimension | 13000x3000x1600mm | ||
four | Tare Weight | 9443g | ||
5 | Payload | 42t | ||
six
|
Managing Program | Axles | FUWA , BPW, HUAJIN manufacturer,13t/16t/20t Great quality axles | |
Suspension | Tri-axle 10-pcs leaf spring suspension with equalizer beam (we can select the Air suspension depend on JCPTer requirement) |
|||
Tires | Linglong, Double Coin, Triangle model eleven.00R20/8.25R20/12.00R22.5, 12unit | |||
7 | Ladder | Manually operated or JCPT sort | ||
8 | Braking Program | Dual lines pneumatic brake system, WABCO Emergency Relay Valve KORMEE Abs braking technique |
||
nine | Body | Main Beam | Q345B steel,Height 500, upper 16mm, lower 18mm. Mid web 10mm |
|
Cross Beam | Mild Alloy Q235 | |||
10 | King Pin | Dimension: 50# (2”) or 90#(three.5”) Type: welded or assembled | ||
eleven | Landing Gear | FUWA, JOST Model Single side operation or double side operation, Static capacity 28Ton |
||
12 | Electrical & Paint | Electrical | Rear light, rear reflector, turn indicative light, side reflector, fog lamp, number plate light | |
JCPTs & Reflectors | 24V, 7 lines | |||
Painting | zinc-prosperous primer and modified urethane topcoat as JCPTers’ choices. | |||
Add-ons | Instrument BOX (BOX ONLY)—Supplied WITH THE TRAILER TWO SPARE WHEEL HOLDER(WINCH),BUT NO SPARE TYRES |
I.The Software and the Technical Highlights:
—The minimal bed semitrailers are primarily suitable for the MID/Extended distance transportation of mechanical products, large objects, freeway development tools, big tanks, energy plant gear or equipment, and all types of steel products.
—The reduced bed semitrailer can bed divide into flat bed minimal bed trailer, concave minimal mattress trailer, tyres show up lower mattress trailer, tyres covered low bed trailer. The concave minimal mattress trailer structured with tyre appeared style, the height of the cargo’s carrying system from floor is 900mm.-Minimal system tends to make the stable transportation.
—The chassis is ladder variety,longitudinal beam segment is H-shaped. It has good rigidity and higher strength.
— Substantial Top quality Body and high-tensile steel for large loading ability
— BPW, FUWA or Certificated Chinese Axles
—Ab muscles brake technique
—WABCO Automobile Manage System
—JOST ,FUWA or Chinese manufacturer parking leg and king pin
—Air and Mechanical Suspension
—Reinforce the Chassis Instructure
II.The Gain
***Frame:employing the advanced assembly welded equipments to weld the place frame composition which fashioned by welded-sort longitudinal beam (produced of 16Mn steel plate) and the total Operate-by way of cross beam.Our contemplate the strength,stiffness and toughness of the frame and design the body is strong adequate to carry the large cargo.
***Suspension: JCPTweight style.Substantial-strength material with sturdy carrying capability, remarkable use resistance property and efficiency steadiness and extended service lifestyle.Wheel Monitor adjustable simply and accurately, which defend the tires from irregular wear.Passed rigorous bench testing and road screening.
***Axle:Specifically processed 1-piece spindle of high good quality reduced alloy metal, which possesses powerful loading capacity, extended life, gentle excess weight and outstanding overall performance.Higher machining precision of the braking system helps make the braking efficiency a lot more secure.
III.Innovative Procedure
~~~Style Drawing: Prior to generation, we will sent the style drawing to our JCPTer to affirm the depth of the automobile. We hope we can source the most appropriate item to our JCPTer.
~~~Cutting and Welding: The I beam chopping adopt the Laptop Numerical Handle Plasma Cutting Machine. The I beam welding adopt the Gantry Principal Sill Welding Machine.
~~~The Beam Welding: Primary beam and aspect beam all use I-formed beam, it can make sure the trailer far more sturdy.Strengthened rear plate can keep away from the rear plate was broken absent when heavy duty equipment climbing the ramp of trailer.
~~~Floor Treatment: In purchase to take away the rust of the trailer physique, we use the sand blasting to retreat the floor of the trailer.
The trailer can have the gorgeous physical appearance,the painting will be coating evenly, firm adhension, gloss much more durable
~~~Painting: A single layer of the anti-rust portray, two layer of painting
~~~Test: We will test the good quality of the trailer before shipping.
IV.The Element of the Low Bed Trailer
V. Classification Of The Reduced Bed Trailer
VI. Guarrantee For The Parts Of The Minimal Bed Traielr:
ITEM NAME | Warranty | ITEM NAME | Guarantee | |||
MAIN FRAME | Frame | 1 YEAR | RUNNING GEAR | AXLE | 6 MONTHS | |
SUSPENSION | 6 MONTHS | AXLE BEARING | 3 MONTHS | |||
KING PIN | 1 YEAR | WHEEL HUB | 3 MONTHS | |||
BALANCE ARM | 3 MONTHS | |||||
ITEM NAME | Warranty | ITEM NAME | Guarantee | |||
BRAKING DEVICE | BRAKE DRUM | 3 MONTHS | SUPPORT DEVICE | LXIHU (WEST LAKE) DIS. GEAR | 6 MONTHS | |
BRKE CHAMBER | 3 MONTHS | SPARE WHEEL CARRIER | 6 MONTHS | |||
AIR RESERVOIR | 6 MONTHS | |||||
ITEM NAME | Warranty | |||||
Other folks | LEAF SPRING | 3 MONTHS | ||||
BRAKE CHAMBER DIAPHRAGM | 3 MONTHS | |||||
EMERGENCY RELAY VALVE | 3 MONTHS | |||||
BRAKE SHOE | 3 MONTHS | |||||
RELAY VALVE | 3 MONTHS |
VII. Working Procedure
one. You send out us an inquiries on your desired trailer by way of our contact data.
2. We shall reply you in twelve hours right after we gained our inquiry.
3. We will negotiate the detail of the trailer on your need.
four. Confirmed on the tech info.
five. Indication agreement.
6.30% down payment or LC issuing.
7. Manufacturing
8. The Manufacturig approach with up to date news.
9. The Manufacturing completement.
10.Harmony payment .
eleven.Prepare Shipment and Custom Clearance
12. A/S provider for 1 yr.