1.Merchandise parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany sort can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/nine./eight./8.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | 1 |
air wiring | doule air line |
electric power wiring | six core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting machine lower the steel to tiny parts use for suitable welding and splicing
2)welding
right after metal cutting process the next stage is welding .this process the principal perform is beam welding .the leading plate-bottom plate and the
middle plate will be welding jointly . this method will be use submerged arc welding approach.this type of welding is very
unique .its exclusively utilized in I beam welding .after this welding approach other parts of the trailer will be use diverse welding way
for various steel-argon arc welding-electrical arc welding-handbook welding-gas welding and so on
three)blasting
this procedure is use for the initial phase of floor cleanness-tension relief-derusting just before paiting .
four)electrophoresis coating
this approach use for more element surface area cleanness
five)epoxy zinc primer spray coating
this approach is the lasting 1 just before paiting .after this method the trailer an be paiting
six)assembly
right after all the approach we have mationed .the very last process of the trailer is assembly.this approach all the elements will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake program and so on
seven)packing
The previous method is packing .all the trailer use diverse packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer