one.Item parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany type can be opentional |
tire | 11R22.five/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./8./8.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | one |
air wiring | doule air line |
electricity wiring | 6 main wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma chopping device reduce the metal to small elements use for ideal welding and splicing
2)welding
following metal reducing approach the following phase is welding .this procedure the primary work is beam welding .the prime plate-base plate and the
middle plate will be welding together . this process will be use submerged arc welding method.this variety of welding is quite
specific .its completely utilized in I beam welding .following this welding approach other components of the trailer will be use different welding way
for various steel-argon arc welding-electric powered arc welding-handbook welding-fuel welding and so on
3)blasting
this process is use for the very first stage of floor cleanness-pressure aid-derusting ahead of paiting .
four)electrophoresis coating
this procedure use for a lot more element surface cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting a single just before paiting .following this process the trailer an be paiting
six)assembly
after all the method we have mationed .the previous process of the trailer is assembly.this procedure all the parts will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake system and so on
seven)packing
The very last procedure is packing .all the trailer use diverse packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer