one.Solution parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany variety can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./eight./8.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | one |
air wiring | doule air line |
electrical power wiring | 6 main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting machine minimize the steel to small areas use for suited welding and splicing
2)welding
after metal slicing method the up coming action is welding .this procedure the main function is beam welding .the prime plate-bottom plate and the
middle plate will be welding with each other . this approach will be use submerged arc welding procedure.this variety of welding is very
particular .its completely used in I beam welding .following this welding process other elements of the trailer will be use diverse welding way
for diverse steel-argon arc welding-electric powered arc welding-handbook welding-gas welding and so on
3)blasting
this process is use for the 1st step of floor cleanness-stress reduction-derusting just before paiting .
four)electrophoresis coating
this procedure use for much more element surface area cleanness
5)epoxy zinc primer spray coating
this procedure is the long lasting 1 before paiting .after this method the trailer an be paiting
6)assembly
right after all the approach we have mationed .the final procedure of the trailer is assembly.this method all the areas will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake program and so on
seven)packing
The last process is packing .all the trailer use distinct packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer