1.Merchandise parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany kind can be opentional |
tire | 11R22.five/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./eight./8.5 |
kingpin | two”/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | one |
air wiring | doule air line |
electricity wiring | six main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma slicing equipment minimize the steel to minor parts use for suitable welding and splicing
two)welding
right after metal slicing process the up coming phase is welding .this procedure the major operate is beam welding .the leading plate-bottom plate and the
middle plate will be welding collectively . this method will be use submerged arc welding method.this variety of welding is very
unique .its completely utilized in I beam welding .after this welding process other components of the trailer will be use distinct welding way
for distinct steel-argon arc welding-electric arc welding-manual welding-gas welding and so on
3)blasting
this process is use for the 1st stage of area cleanness-pressure aid-derusting before paiting .
4)electrophoresis coating
this method use for far more element surface cleanness
five)epoxy zinc primer spray coating
this approach is the long lasting one particular ahead of paiting .after this approach the trailer an be paiting
six)assembly
soon after all the approach we have mationed .the last process of the trailer is assembly.this approach all the components will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake program and so on
7)packing
The final procedure is packing .all the trailer use various packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer