3 Axles 80t Lowbed Lowboy Low Flatbed Loader Drop Deck Trailer

3 Axles 80t Lowbed Lowboy Low Flatbed Loader Drop Deck Trailer

one.Item parameters
 

dimension 13000mm*2550*3440
payload 60ton 
tare weight  7000kg
axle 3x13ton/14ton/16ton/20ton   brand can be opentional 
suspension  mechanical suspension/air suspension/american sort/germany type can be opentional
tire 11R22.five/12R22.5/11.00R20/12.00R20    brand can be opentional 
wheel rim 8.twenty five/nine./8./eight.5 
kingpin  2″/3.5″
I  beam  up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm:
substance:Q345B/T700
landing gear  jost c200 /fuwa  two velocity 28ton 
floor 3mm checkered plate
twist lock  Optional
spare tire carrier  two pcs 
tool box one
air wiring  doule air line 
electric power wiring six main wiring24v or 12v LED lamp
brake program wabco relay valvedrum braket30/30 brake chamber 
paiting  comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2  coats of closing paiting
colour  Optional
accessories  brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp

two.Normal Procedure

1)cutting  
use the plasma chopping machine cut the steel to little parts use for appropriate welding and splicing
 
2)welding  
soon after steel reducing approach the up coming step is welding .this process the principal function is beam welding .the prime plate-bottom plate and the
middle  plate  will  be welding together .  this approach will be use submerged arc welding method.this type of welding is quite
unique .its completely employed in I beam welding .right after this welding approach other parts of the trailer will be use different welding way
for distinct steel-argon arc welding-electrical arc welding-guide welding-fuel welding and so on
 
3)blasting
this procedure is use for the 1st stage of surface cleanness-pressure relief-derusting ahead of paiting .
 
4)electrophoresis coating  
this process use for much more detail surface area cleanness
 
5)epoxy zinc primer spray coating 
this approach is the lasting one particular just before paiting .after this procedure the trailer an be paiting
 
6)assembly
soon after all the process we have mationed .the last treatment of the trailer is assembly.this procedure all the parts will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake system and so on

7)packing 
The very last method is packing .all the trailer use various packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer

 

3 Axles 80t Lowbed Lowboy Low Flatbed Loader Drop Deck Trailer

Tags:

locking collar

As one of leading locking collar manufacturers, suppliers and exporters of products, We offer locking collar and many other products.

Please contact us for details.

Mail:sales@lockingcollar.com

Manufacturer supplier exporter of locking collar

Recent Posts