one.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany type can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./8./eight.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | one |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma chopping machine cut the steel to little parts use for appropriate welding and splicing
2)welding
soon after steel reducing approach the up coming step is welding .this process the principal function is beam welding .the prime plate-bottom plate and the
middle plate will be welding together . this approach will be use submerged arc welding method.this type of welding is quite
unique .its completely employed in I beam welding .right after this welding approach other parts of the trailer will be use different welding way
for distinct steel-argon arc welding-electrical arc welding-guide welding-fuel welding and so on
3)blasting
this procedure is use for the 1st stage of surface cleanness-pressure relief-derusting ahead of paiting .
4)electrophoresis coating
this process use for much more detail surface area cleanness
5)epoxy zinc primer spray coating
this approach is the lasting one particular just before paiting .after this procedure the trailer an be paiting
6)assembly
soon after all the process we have mationed .the last treatment of the trailer is assembly.this procedure all the parts will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake system and so on
7)packing
The very last method is packing .all the trailer use various packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer