3 Axles JCPT Low Bed Semi Trailer three Axles Lowbed sixty/80/one hundred Ton JCPT Obligation Machine Transport Carriers Gooseneck Reduced Mattress Loader Fall Deck Mining Truck Semi
AIN Overall performance
Product Specification | ||||
1 | Variety | Semitrailer | ||
2 | Product Identify | Minimal Mattress Semitrailer | ||
3 | Dimension | 13000x3000x1600mm | ||
four | Tare Bodyweight | 9528g | ||
5 | Payload | 43t | ||
six
|
Running Program | Axles | FUWA , BPW, HUAJIN brand name,13t/16t/20t Excellent top quality axles | |
Suspension | Tri-axle 10-pcs leaf spring suspension with equalizer beam (we can pick the Air suspension depend on JCPTer prerequisite) |
|||
Tires | Linglong, Double Coin, Triangle manufacturer eleven.00R20/8.25R20/twelve.00R22.five, 12unit | |||
7 | Ladder | Manually operated or JCPT sort | ||
8 | Braking Method | Dual lines pneumatic brake system, WABCO Emergency Relay Valve KORMEE Stomach muscles braking technique |
||
nine | Body | Main Beam | Q345B steel,Height 500, upper 16mm, lower 18mm. Mid web 10mm |
|
Cross Beam | Mild Alloy Q235 | |||
10 | King Pin | Size: 50# (2”) or 90#(3.5”) Type: welded or assembled | ||
11 | Landing Gear | FUWA, JOST Model Single side operation or double side operation, Static capacity 28Ton |
||
twelve | Electrical & Paint | Electrical | Rear light, rear reflector, turn indicative light, side reflector, fog lamp, number plate light | |
JCPTs & Reflectors | 24V, 7 lines | |||
Portray | zinc-wealthy primer and modified urethane topcoat as JCPTers’ selections. | |||
Components | Instrument BOX (BOX ONLY)—Presented WITH THE TRAILER TWO SPARE WHEEL HOLDER(WINCH),BUT NO SPARE TYRES |
I.The Software and the Technical Highlights:
—The minimal bed semitrailers are mainly suitable for the MID/Long distance transportation of mechanical gear, large objects, freeway development tools, large tanks, energy plant products or equipment, and all kinds of metal items.
—The minimal bed semitrailer can mattress divide into flat mattress lower bed trailer, concave low bed trailer, tyres appear reduced bed trailer, tyres lined minimal mattress trailer. The concave lower bed trailer structured with tyre appeared fashion, the height of the cargo’s carrying platform from floor is 900mm.-Low platform can make the stable transportation.
—The chassis is ladder sort,longitudinal beam section is H-shaped. It has great rigidity and high power.
— High Top quality Body and large-tensile metal for large loading potential
— BPW, FUWA or Certificated Chinese Axles
—Abdominal muscles brake program
—WABCO Car Control Technique
—JOST ,FUWA or Chinese manufacturer parking leg and king pin
—Air and Mechanical Suspension
—Improve the Chassis Instructure
II.The Edge
***Frame:employing the innovative assembly welded equipments to weld the area frame construction which shaped by welded-type longitudinal beam (created of 16Mn steel plate) and the whole Run-by way of cross beam.Our consider the power,stiffness and toughness of the frame and design the body is robust adequate to have the hefty cargo.
***Suspension: JCPTweight design and style.Higher-power materials with robust carrying ability, remarkable use resistance house and efficiency stability and long provider daily life.Wheel Monitor adjustable easily and correctly, which protect the tires from irregular use.Passed rigorous bench screening and highway screening.
***Axle:Specifically processed 1-piece spindle of higher top quality minimal alloy metal, which possesses sturdy loading capacity, lengthy life, light-weight weight and impressive functionality.Substantial machining precision of the braking system helps make the braking performance far more stable.
III.Sophisticated Procedure
~~~Layout Drawing: Before manufacturing, we will sent the design and style drawing to our JCPTer to verify the depth of the motor vehicle. We hope we can supply the most ideal solution to our JCPTer.
~~~Slicing and Welding: The I beam slicing undertake the Computer Numerical Management Plasma Reducing Device. The I beam welding adopt the Gantry Major Sill Welding Equipment.
~~~The Beam Welding: Major beam and aspect beam all use I-shaped beam, it can make sure the trailer far more durable.Bolstered rear plate can keep away from the rear plate was damaged absent when large responsibility devices climbing the ramp of trailer.
~~~Surface area Treatment: In purchase to eliminate the rust of the trailer physique, we use the sand blasting to retreat the surface area of the trailer.
The trailer can have the gorgeous physical appearance,the painting will be coating evenly, firm adhension, gloss much more durable
~~~Painting: 1 layer of the anti-rust portray, two layer of portray
~~~Take a look at: We will examination the good quality of the trailer ahead of supply.
IV.The Detail of the Low Mattress Trailer
V. Classification Of The Lower Bed Trailer
VI. Guarrantee For The Parts Of The Low Bed Traielr:
ITEM NAME | Guarantee | ITEM NAME | Guarantee | |||
MAIN FRAME | Frame | 1 YEAR | RUNNING GEAR | AXLE | 6 MONTHS | |
SUSPENSION | 6 MONTHS | AXLE BEARING | 3 MONTHS | |||
KING PIN | 1 YEAR | WHEEL HUB | 3 MONTHS | |||
BALANCE ARM | 3 MONTHS | |||||
ITEM NAME | Guarantee | ITEM NAME | Warranty | |||
BRAKING DEVICE | BRAKE DRUM | 3 MONTHS | SUPPORT DEVICE | LXIHU (WEST LAKE) DIS. GEAR | 6 MONTHS | |
BRKE CHAMBER | 3 MONTHS | SPARE WHEEL CARRIER | 6 MONTHS | |||
AIR RESERVOIR | 6 MONTHS | |||||
ITEM NAME | Guarantee | |||||
Other individuals | LEAF SPRING | 3 MONTHS | ||||
BRAKE CHAMBER DIAPHRAGM | 3 MONTHS | |||||
EMERGENCY RELAY VALVE | 3 MONTHS | |||||
BRAKE SHOE | 3 MONTHS | |||||
RELAY VALVE | 3 MONTHS |
VII. Dealing Process
one. You ship us an inquiries on your desired trailer through our contact data.
2. We shall reply you in 12 several hours following we obtained our inquiry.
three. We will negotiate the depth of the trailer on your necessity.
4. Verified on the tech knowledge.
5. Indicator contract.
6.30% down payment or LC issuing.
seven. Generation
8. The Manufacturig process with up-to-date news.
nine. The Creation completement.
10.Stability payment .
11.Organize Shipment and Custom Clearance
twelve. A/S service for one yr.
Tri-Axles Minimal Bed Semi Trailer
fifty Tons 60 Tons Low Mattress Semi Trailers for Sale
Tri-Axles Lower Mattress Semi Trailer