one.Item parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany type can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./eight./eight.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | one |
air wiring | doule air line |
electrical energy wiring | 6 main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing device cut the metal to small elements use for suited welding and splicing
2)welding
right after metal chopping method the subsequent stage is welding .this method the major operate is beam welding .the top plate-base plate and the
middle plate will be welding with each other . this method will be use submerged arc welding method.this type of welding is very
special .its solely employed in I beam welding .after this welding process other elements of the trailer will be use distinct welding way
for diverse metal-argon arc welding-electric arc welding-manual welding-gasoline welding and so on
three)blasting
this process is use for the very first stage of surface area cleanness-tension reduction-derusting ahead of paiting .
4)electrophoresis coating
this procedure use for more element area cleanness
5)epoxy zinc primer spray coating
this process is the lasting one particular just before paiting .following this procedure the trailer an be paiting
six)assembly
right after all the process we have mationed .the last treatment of the trailer is assembly.this method all the elements will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
7)packing
The last procedure is packing .all the trailer use different packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer