one.Product parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany type can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./8.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | 1 |
air wiring | doule air line |
electrical energy wiring | six core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing device reduce the steel to tiny components use for suited welding and splicing
2)welding
after steel chopping approach the subsequent phase is welding .this process the major function is beam welding .the top plate-bottom plate and the
middle plate will be welding together . this process will be use submerged arc welding process.this type of welding is quite
specific .its exclusively used in I beam welding .right after this welding method other elements of the trailer will be use diverse welding way
for diverse metal-argon arc welding-electric powered arc welding-handbook welding-gasoline welding and so on
three)blasting
this approach is use for the first stage of floor cleanness-anxiety aid-derusting prior to paiting .
4)electrophoresis coating
this approach use for far more detail surface area cleanness
five)epoxy zinc primer spray coating
this approach is the long lasting 1 ahead of paiting .after this method the trailer an be paiting
6)assembly
after all the process we have mationed .the very last treatment of the trailer is assembly.this method all the areas will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake system and so on
seven)packing
The final approach is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer