one.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany variety can be opentional |
tire | 11R22.five/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/9./eight./eight.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | 1 |
air wiring | doule air line |
electricity wiring | 6 main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma reducing equipment reduce the steel to little components use for suitable welding and splicing
two)welding
following metal reducing procedure the next action is welding .this method the primary work is beam welding .the leading plate-bottom plate and the
middle plate will be welding jointly . this procedure will be use submerged arc welding procedure.this kind of welding is really
particular .its solely utilised in I beam welding .following this welding process other areas of the trailer will be use diverse welding way
for distinct steel-argon arc welding-electric arc welding-manual welding-gasoline welding and so on
three)blasting
this procedure is use for the initial action of floor cleanness-stress aid-derusting ahead of paiting .
four)electrophoresis coating
this process use for more detail surface area cleanness
5)epoxy zinc primer spray coating
this procedure is the long lasting one ahead of paiting .soon after this process the trailer an be paiting
6)assembly
after all the method we have mationed .the very last treatment of the trailer is assembly.this method all the areas will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
seven)packing
The last process is packing .all the trailer use various packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer