one.Item parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./eight.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | one |
air wiring | doule air line |
electrical energy wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma cutting machine minimize the metal to small elements use for suited welding and splicing
two)welding
after steel cutting procedure the subsequent phase is welding .this process the principal perform is beam welding .the top plate-base plate and the
middle plate will be welding jointly . this method will be use submerged arc welding method.this sort of welding is very
specific .its completely used in I beam welding .right after this welding procedure other components of the trailer will be use diverse welding way
for different steel-argon arc welding-electric powered arc welding-handbook welding-gas welding and so on
three)blasting
this process is use for the first step of surface cleanness-tension reduction-derusting before paiting .
four)electrophoresis coating
this process use for much more depth surface cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting one prior to paiting .after this approach the trailer an be paiting
6)assembly
after all the method we have mationed .the previous treatment of the trailer is assembly.this process all the components will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake program and so on
7)packing
The last process is packing .all the trailer use diverse packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer