one.Merchandise parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany variety can be opentional |
tire | 11R22.5/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./eight./8.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | 1 |
air wiring | doule air line |
electrical power wiring | six main wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma cutting machine reduce the metal to tiny components use for ideal welding and splicing
two)welding
right after metal chopping approach the subsequent action is welding .this method the principal work is beam welding .the top plate-base plate and the
middle plate will be welding collectively . this method will be use submerged arc welding approach.this type of welding is extremely
special .its exclusively employed in I beam welding .right after this welding procedure other parts of the trailer will be use distinct welding way
for diverse metal-argon arc welding-electric arc welding-guide welding-fuel welding and so on
three)blasting
this process is use for the 1st action of surface cleanness-anxiety reduction-derusting prior to paiting .
4)electrophoresis coating
this process use for far more depth floor cleanness
five)epoxy zinc primer spray coating
this procedure is the long lasting one before paiting .right after this procedure the trailer an be paiting
6)assembly
following all the procedure we have mationed .the previous process of the trailer is assembly.this approach all the components will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake system and so on
seven)packing
The last process is packing .all the trailer use various packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer