one.Item parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany variety can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/nine./8./eight.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | one |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma chopping machine reduce the steel to tiny components use for suitable welding and splicing
2)welding
right after metal reducing method the next action is welding .this approach the major work is beam welding .the prime plate-base plate and the
middle plate will be welding collectively . this process will be use submerged arc welding approach.this sort of welding is very
particular .its solely utilized in I beam welding .following this welding procedure other parts of the trailer will be use different welding way
for various metal-argon arc welding-electric powered arc welding-guide welding-gasoline welding and so on
three)blasting
this method is use for the initial action of floor cleanness-pressure reduction-derusting ahead of paiting .
four)electrophoresis coating
this process use for much more depth area cleanness
5)epoxy zinc primer spray coating
this process is the long lasting a single prior to paiting .after this method the trailer an be paiting
six)assembly
following all the method we have mationed .the final procedure of the trailer is assembly.this method all the parts will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake program and so on
7)packing
The previous method is packing .all the trailer use distinct packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer