1.Solution parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./eight./eight.5 |
kingpin | two”/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | one |
air wiring | doule air line |
electrical energy wiring | 6 core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma slicing machine reduce the steel to minor elements use for suited welding and splicing
two)welding
soon after steel chopping approach the following action is welding .this procedure the principal operate is beam welding .the prime plate-bottom plate and the
middle plate will be welding collectively . this approach will be use submerged arc welding process.this variety of welding is quite
special .its exclusively used in I beam welding .after this welding process other areas of the trailer will be use distinct welding way
for diverse steel-argon arc welding-electric arc welding-handbook welding-fuel welding and so on
3)blasting
this method is use for the very first phase of surface cleanness-tension relief-derusting before paiting .
4)electrophoresis coating
this approach use for a lot more depth area cleanness
five)epoxy zinc primer spray coating
this process is the lasting one prior to paiting .following this process the trailer an be paiting
six)assembly
right after all the process we have mationed .the final method of the trailer is assembly.this approach all the parts will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake program and so on
7)packing
The previous process is packing .all the trailer use distinct packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer