1.Merchandise parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany sort can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./8./8.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | 1 |
air wiring | doule air line |
electrical energy wiring | six core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting equipment cut the metal to minor areas use for suited welding and splicing
two)welding
after metal chopping process the subsequent stage is welding .this method the principal function is beam welding .the leading plate-base plate and the
middle plate will be welding collectively . this method will be use submerged arc welding method.this kind of welding is really
special .its exclusively utilized in I beam welding .right after this welding procedure other elements of the trailer will be use various welding way
for distinct metal-argon arc welding-electric powered arc welding-guide welding-gasoline welding and so on
3)blasting
this approach is use for the very first phase of surface cleanness-anxiety relief-derusting ahead of paiting .
four)electrophoresis coating
this approach use for far more depth area cleanness
five)epoxy zinc primer spray coating
this procedure is the lasting one just before paiting .right after this process the trailer an be paiting
6)assembly
after all the method we have mationed .the final treatment of the trailer is assembly.this process all the areas will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake system and so on
7)packing
The last procedure is packing .all the trailer use diverse packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer