1.Solution parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany type can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/9./eight./8.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | one |
air wiring | doule air line |
electricity wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma slicing machine cut the metal to little areas use for suited welding and splicing
2)welding
following metal slicing approach the next stage is welding .this method the primary function is beam welding .the leading plate-bottom plate and the
middle plate will be welding together . this procedure will be use submerged arc welding approach.this sort of welding is extremely
unique .its completely used in I beam welding .right after this welding process other parts of the trailer will be use various welding way
for diverse steel-argon arc welding-electric arc welding-manual welding-gasoline welding and so on
3)blasting
this process is use for the 1st action of surface cleanness-pressure relief-derusting just before paiting .
4)electrophoresis coating
this approach use for more depth surface cleanness
five)epoxy zinc primer spray coating
this procedure is the lasting a single just before paiting .after this approach the trailer an be paiting
6)assembly
following all the approach we have mationed .the very last process of the trailer is assembly.this procedure all the elements will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
7)packing
The final procedure is packing .all the trailer use various packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer