one.Product parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./8./8.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | one |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma cutting equipment reduce the metal to minor areas use for ideal welding and splicing
2)welding
after metal chopping approach the up coming step is welding .this process the principal operate is beam welding .the top plate-bottom plate and the
middle plate will be welding together . this procedure will be use submerged arc welding approach.this variety of welding is very
unique .its exclusively used in I beam welding .soon after this welding approach other elements of the trailer will be use distinct welding way
for diverse steel-argon arc welding-electrical arc welding-manual welding-fuel welding and so on
three)blasting
this procedure is use for the very first stage of surface area cleanness-tension relief-derusting before paiting .
four)electrophoresis coating
this procedure use for much more depth surface cleanness
5)epoxy zinc primer spray coating
this method is the lasting 1 ahead of paiting .following this process the trailer an be paiting
six)assembly
following all the method we have mationed .the final procedure of the trailer is assembly.this procedure all the areas will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
7)packing
The last approach is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer