1.Solution parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/9./eight./eight.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | one |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma slicing machine cut the metal to small areas use for ideal welding and splicing
2)welding
soon after metal slicing process the next stage is welding .this procedure the primary function is beam welding .the leading plate-base plate and the
middle plate will be welding jointly . this approach will be use submerged arc welding method.this variety of welding is extremely
particular .its completely used in I beam welding .after this welding procedure other components of the trailer will be use various welding way
for diverse steel-argon arc welding-electrical arc welding-handbook welding-gas welding and so on
3)blasting
this method is use for the very first step of area cleanness-anxiety relief-derusting before paiting .
4)electrophoresis coating
this approach use for much more detail floor cleanness
5)epoxy zinc primer spray coating
this process is the lasting one particular prior to paiting .right after this procedure the trailer an be paiting
6)assembly
soon after all the method we have mationed .the last procedure of the trailer is assembly.this method all the components will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake technique and so on
7)packing
The very last procedure is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer