one.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./8./8.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | 1 |
air wiring | doule air line |
electrical energy wiring | 6 main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma chopping machine cut the metal to little areas use for suited welding and splicing
two)welding
soon after metal chopping method the following step is welding .this process the main operate is beam welding .the prime plate-base plate and the
middle plate will be welding with each other . this procedure will be use submerged arc welding approach.this sort of welding is extremely
specific .its exclusively utilized in I beam welding .soon after this welding approach other parts of the trailer will be use various welding way
for different metal-argon arc welding-electrical arc welding-manual welding-gas welding and so on
3)blasting
this method is use for the very first step of floor cleanness-tension reduction-derusting just before paiting .
4)electrophoresis coating
this approach use for much more detail surface area cleanness
five)epoxy zinc primer spray coating
this process is the lasting 1 just before paiting .following this method the trailer an be paiting
6)assembly
right after all the process we have mationed .the very last procedure of the trailer is assembly.this procedure all the components will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake technique and so on
seven)packing
The very last process is packing .all the trailer use distinct packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer