1.Merchandise parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany type can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./eight.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | 1 |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma chopping machine lower the metal to tiny components use for ideal welding and splicing
2)welding
following steel reducing method the subsequent step is welding .this process the main function is beam welding .the prime plate-bottom plate and the
middle plate will be welding collectively . this procedure will be use submerged arc welding method.this type of welding is really
particular .its exclusively utilized in I beam welding .after this welding procedure other areas of the trailer will be use different welding way
for different steel-argon arc welding-electric powered arc welding-manual welding-gas welding and so on
three)blasting
this approach is use for the 1st action of floor cleanness-pressure relief-derusting just before paiting .
four)electrophoresis coating
this process use for far more element area cleanness
five)epoxy zinc primer spray coating
this process is the lasting a single ahead of paiting .after this approach the trailer an be paiting
6)assembly
following all the procedure we have mationed .the last process of the trailer is assembly.this method all the elements will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
7)packing
The final approach is packing .all the trailer use diverse packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer