1.Merchandise parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany variety can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/9./eight./8.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | 1 |
air wiring | doule air line |
electrical power wiring | six core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma chopping device cut the metal to minor elements use for appropriate welding and splicing
2)welding
after metal slicing process the next step is welding .this approach the major function is beam welding .the best plate-base plate and the
middle plate will be welding together . this approach will be use submerged arc welding process.this variety of welding is really
special .its exclusively utilised in I beam welding .after this welding approach other parts of the trailer will be use various welding way
for different steel-argon arc welding-electric arc welding-manual welding-fuel welding and so on
three)blasting
this process is use for the initial action of area cleanness-pressure reduction-derusting prior to paiting .
four)electrophoresis coating
this method use for more detail area cleanness
5)epoxy zinc primer spray coating
this method is the long lasting one particular before paiting .following this process the trailer an be paiting
six)assembly
after all the approach we have mationed .the very last procedure of the trailer is assembly.this process all the components will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on
seven)packing
The last procedure is packing .all the trailer use different packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer