60t three Axle Minimal Mattress Semi Trailer for Sale Small Gear Low Loader Semitrailer 2-Axle Gooseneck Low Mattress Trailer 20ton
Primary Efficiency
Merchandise Specification | ||||
1 | Variety | Semitrailer | ||
2 | Item Title | Reduced Bed Semitrailer | ||
three | Dimension | 13000x3000x1600mm | ||
four | Tare Excess weight | 9290kg | ||
5 | Payload | 42t | ||
6
|
Running Technique | Axles | FUWA , BPW, HUAJIN brand,13t/16t/20t Great top quality axles | |
Suspension | Tri-axle 10-pcs leaf spring suspension with equalizer beam (we can choose the Air suspension depend on JCPTer need) |
|||
Tires | Linglong, Double Coin, Triangle brand name 11.00R20/8.25R20/twelve.00R22.five, 12unit | |||
7 | Ladder | Manually operated or JCPT sort | ||
8 | Braking Program | Dual lines pneumatic brake system, WABCO Emergency Relay Valve KORMEE Ab muscles braking technique |
||
9 | Body | Main Beam | Q345B steel,Height 500, upper 16mm, lower 18mm. Mid web 10mm |
|
Cross Beam | Mild Alloy Q235 | |||
ten | King Pin | Dimension: 50# (2”) or 90#(3.5”) Type: welded or assembled | ||
11 | Landing Gear | FUWA, JOST Manufacturer Single side operation or double side operation, Static capacity 28Ton |
||
twelve | Electrical & Paint | Electrical | Rear light, rear reflector, turn indicative light, side reflector, fog lamp, number plate light | |
JCPTs & Reflectors | 24V, 7 lines | |||
Painting | zinc-abundant primer and modified urethane topcoat as JCPTers’ alternatives. | |||
Components | Device BOX (BOX ONLY)—Provided WITH THE TRAILER TWO SPARE WHEEL HOLDER(WINCH),BUT NO SPARE TYRES |
I.The Application and the Technical Highlights:
—The lower bed semitrailers are mainly suited for the MID/Prolonged length transportation of mechanical gear, huge objects, freeway building gear, huge tanks, energy plant equipment or equipment, and all sorts of metal goods.
—The lower mattress semitrailer can mattress divide into flat bed reduced mattress trailer, concave lower mattress trailer, tyres appear reduced bed trailer, tyres lined low mattress trailer. The concave low mattress trailer structured with tyre appeared type, the height of the cargo’s carrying platform from floor is 900mm.-Reduced system helps make the stable transportation.
—The chassis is ladder variety,longitudinal beam section is H-formed. It has great rigidity and higher energy.
— Higher Top quality Body and substantial-tensile metal for hefty loading capacity
— BPW, FUWA or Certificated Chinese Axles
—Abs brake program
—WABCO Motor vehicle Manage Program
—JOST ,FUWA or Chinese model parking leg and king pin
—Air and Mechanical Suspension
—Reinforce the Chassis Instructure
II.The Edge
***Frame:making use of the sophisticated assembly welded equipments to weld the place body composition which shaped by welded-kind longitudinal beam (produced of 16Mn steel plate) and the whole Run-by means of cross beam.Our think about the energy,stiffness and toughness of the frame and design and style the frame is strong adequate to have the hefty cargo.
***Suspension: JCPTweight design.Higher-strength materials with sturdy carrying potential, impressive put on resistance home and overall performance steadiness and long service life.Wheel Observe adjustable very easily and precisely, which protect the tires from abnormal dress in.Passed rigid bench screening and highway screening.
***Axle:Specifically processed one-piece spindle of high good quality lower alloy metal, which possesses robust loading capability, long existence, light weight and exceptional efficiency.Large machining precision of the braking program can make the braking efficiency far more stable.
III.Innovative Procedure
~~~Style Drawing: Prior to manufacturing, we will despatched the layout drawing to our JCPTer to affirm the depth of the automobile. We hope we can offer the most suitable product to our JCPTer.
~~~Cutting and Welding: The I beam chopping undertake the Personal computer Numerical Handle Plasma Slicing Device. The I beam welding adopt the Gantry Principal Sill Welding Device.
~~~The Beam Welding: Major beam and side beam all use I-shaped beam, it can guarantee the trailer much more durable.Strengthened rear plate can avoid the rear plate was damaged away when weighty obligation devices climbing the ramp of trailer.
~~~Floor Remedy: In buy to remove the rust of the trailer entire body, we use the sand blasting to retreat the surface of the trailer.
The trailer can have the stunning visual appeal,the painting will be coating evenly, organization adhension, gloss a lot more resilient
~~~Portray: One particular layer of the anti-rust painting, two layer of painting
~~~Test: We will check the quality of the trailer prior to delivery.
IV.The Depth of the Low Bed Trailer
V. Classification Of The Low Bed Trailer
VI. Guarrantee For The Areas Of The Low Mattress Traielr:
ITEM NAME | Guarantee | ITEM NAME | Guarantee | |||
MAIN FRAME | Body | 1 YEAR | RUNNING GEAR | AXLE | 6 MONTHS | |
SUSPENSION | 6 MONTHS | AXLE BEARING | 3 MONTHS | |||
KING PIN | 1 YEAR | WHEEL HUB | 3 MONTHS | |||
BALANCE ARM | 3 MONTHS | |||||
ITEM NAME | Warranty | ITEM NAME | Warranty | |||
BRAKING DEVICE | BRAKE DRUM | 3 MONTHS | SUPPORT DEVICE | LXIHU (WEST LAKE) DIS. GEAR | 6 MONTHS | |
BRKE CHAMBER | 3 MONTHS | SPARE WHEEL CARRIER | 6 MONTHS | |||
AIR RESERVOIR | 6 MONTHS | |||||
ITEM NAME | Guarantee | |||||
Other individuals | LEAF SPRING | 3 MONTHS | ||||
BRAKE CHAMBER DIAPHRAGM | 3 MONTHS | |||||
EMERGENCY RELAY VALVE | 3 MONTHS | |||||
BRAKE SHOE | 3 MONTHS | |||||
RELAY VALVE | 3 MONTHS |
VII. Working Method
one. You send out us an inquiries on your preferred trailer by way of our speak to details.
2. We shall reply you in twelve hrs following we gained our inquiry.
three. We will negotiate the detail of the trailer on your need.
four. Verified on the tech information.
5. Sign agreement.
six.30% down payment or LC issuing.
seven. Manufacturing
8. The Manufacturig approach with up to date news.
9. The Production completement.
10.Stability payment .
11.Organize Shipment and Custom Clearance
12. A/S services for one yr.