one.Merchandise parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany sort can be opentional |
tire | 11R22.5/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./eight./8.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
device box | one |
air wiring | doule air line |
electrical energy wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing device lower the metal to small parts use for appropriate welding and splicing
two)welding
soon after metal chopping process the up coming phase is welding .this approach the principal work is beam welding .the prime plate-base plate and the
middle plate will be welding jointly . this method will be use submerged arc welding approach.this variety of welding is extremely
unique .its completely utilized in I beam welding .right after this welding process other components of the trailer will be use various welding way
for distinct metal-argon arc welding-electrical arc welding-manual welding-gas welding and so on
3)blasting
this approach is use for the initial step of area cleanness-anxiety relief-derusting just before paiting .
four)electrophoresis coating
this method use for far more depth floor cleanness
5)epoxy zinc primer spray coating
this approach is the long lasting 1 ahead of paiting .soon after this procedure the trailer an be paiting
6)assembly
right after all the approach we have mationed .the final method of the trailer is assembly.this approach all the parts will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake method and so on
seven)packing
The last process is packing .all the trailer use different packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer