one.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany type can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./eight./eight.5 |
kingpin | two”/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | 1 |
air wiring | doule air line |
electric power wiring | six core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma slicing equipment lower the steel to minor areas use for suitable welding and splicing
two)welding
after steel chopping procedure the subsequent phase is welding .this method the principal function is beam welding .the leading plate-base plate and the
middle plate will be welding collectively . this process will be use submerged arc welding method.this kind of welding is really
unique .its completely utilised in I beam welding .after this welding process other components of the trailer will be use different welding way
for different steel-argon arc welding-electric powered arc welding-manual welding-gas welding and so on
3)blasting
this process is use for the very first action of floor cleanness-tension aid-derusting ahead of paiting .
4)electrophoresis coating
this approach use for more element area cleanness
five)epoxy zinc primer spray coating
this process is the long lasting one ahead of paiting .soon after this method the trailer an be paiting
six)assembly
soon after all the approach we have mationed .the very last method of the trailer is assembly.this process all the parts will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake technique and so on
seven)packing
The final process is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer