1.Item parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./eight./eight.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | 1 |
air wiring | doule air line |
electrical energy wiring | 6 main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma cutting device cut the steel to small components use for suited welding and splicing
2)welding
after metal reducing procedure the up coming phase is welding .this procedure the primary operate is beam welding .the best plate-base plate and the
middle plate will be welding with each other . this method will be use submerged arc welding method.this sort of welding is very
unique .its exclusively utilised in I beam welding .right after this welding method other elements of the trailer will be use distinct welding way
for distinct steel-argon arc welding-electric powered arc welding-guide welding-fuel welding and so on
three)blasting
this approach is use for the first action of floor cleanness-tension relief-derusting prior to paiting .
4)electrophoresis coating
this process use for more detail surface area cleanness
5)epoxy zinc primer spray coating
this approach is the long lasting a single ahead of paiting .soon after this method the trailer an be paiting
six)assembly
following all the procedure we have mationed .the previous method of the trailer is assembly.this method all the components will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake technique and so on
7)packing
The final method is packing .all the trailer use distinct packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer