1.Item parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany variety can be opentional |
tire | 11R22.five/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./8./eight.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | 1 |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma chopping equipment cut the metal to little components use for suitable welding and splicing
two)welding
following metal cutting method the up coming action is welding .this process the major function is beam welding .the top plate-bottom plate and the
middle plate will be welding together . this procedure will be use submerged arc welding procedure.this variety of welding is extremely
special .its solely employed in I beam welding .soon after this welding method other components of the trailer will be use various welding way
for different metal-argon arc welding-electric powered arc welding-manual welding-fuel welding and so on
three)blasting
this process is use for the 1st step of area cleanness-stress reduction-derusting before paiting .
4)electrophoresis coating
this procedure use for far more depth surface area cleanness
5)epoxy zinc primer spray coating
this process is the lasting one just before paiting .right after this approach the trailer an be paiting
six)assembly
soon after all the process we have mationed .the last method of the trailer is assembly.this approach all the components will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake system and so on
seven)packing
The final process is packing .all the trailer use distinct packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer