Functions And Advantages
- Total port, one/four”~4″ (DN8~DN100)
- W. P.: a thousand WOG(PN63)
- W. T.:-20ºC ~200ºC (-4ºF~392ºF)
- Investment casting
- Blow-out evidence stem
- Reside-loading unit
- Locking system
- Anti-static system
- ISO 5211 Direct Mounting pad
- JCPTmation equipment (option)
- Connection: NPT, DIN2999,BSP,G,SOCKET WELD,BUTT WELD
Product | Areas | Materials | |
one | Entire body | SS304/SS316 | ASTM A216-WCB |
two | CAP | ||
three | BALL | ASTM SS304/SS316-CF8M | |
4 | SEAT | PTFE/RTFE | |
five | SEAL | PTFE | |
6 | STEM | SS304/SS316 | |
7 | O-RING | VITON | |
eight | JCPTING | PTFE | |
9 | THRUST WASHER | ||
10 | GLAND RING | AISI 304 | |
11 | BELLEVILLE WASHER | AISI 301 | |
twelve | LOCKING WASHER | AISI 201 | |
13 | LOCKING Device | ||
fourteen | STEM NUT | ||
15 | Deal with | STAINLESS Steel | |
sixteen | Take care of SLEEVE | PVC | |
17 | JCPT | AISI 201 | |
eighteen | NUT | ||
19 | SPRING WASHER |
DN | d | L | H | H1 | H2 | W | S | D1 | D2 | R1 | R2 | ISO 5211 | Torque (N-M) | Bodyweight (kg) |
8 | 11.6 | 65 | sixty one | 7.five | 35.three | 114.five | 9 | 36 | forty two | 2.75 | two.seventy five | F03 / F04 | 7 | – |
ten | 12.five | 65 | 61 | 7.five | 35.three | 114.five | nine | 36 | 42 | two.75 | two.seventy five | F03 / F04 | seven | – |
15 | 15 | sixty five | sixty two.seven | seven.one | 36.four | 114.five | 9 | 36 | forty two | two.75 | 2.75 | F03 / F04 | 7 | .6 |
twenty | 20 | seventy five | 65.1 | 7.3 | 39.five | 114.five | 9 | 36 | forty two | two.seventy five | 2.seventy five | F03 / F04 | nine | .7 |
twenty five | 25 | 85 | seventy six.five | eleven | forty nine | 140 | 11 | 42 | 50 | 2.seventy five | 3.5 | F04 / F05 | fifteen | 1.one |
32 | 32 | one zero one | eighty two | eleven.five | 54.two | a hundred and forty | 11 | 42 | 50 | two.75 | three.5 | F04 / F05 | 18 | 1.seven |
forty | 38 | 112 | 102 | twelve.four | sixty four.six | 172 | 14 | fifty | 70 | three.five | four.5 | F05 / F07 | 25 | 2.6 |
50 | fifty | one hundred thirty | a hundred and ten.one | thirteen.six | seventy two.5 | 172 | 14 | fifty | 70 | three.5 | four.5 | F05 / F07 | 35 | three.seven |
sixty five | 63 | 162 | 127.3 | 16.three | 92 | 325 | seventeen | 70 | 102 | 4.5 | five.five | F07 / F10 | fifty five | seven.1 |
eighty | 76 | 188 | 136.3 | sixteen.three | one hundred | 325 | 17 | 70 | 102 | 4.five | five.five | F07 / F10 | 70 | 10.two |
one hundred | ninety six | 224 | 142.five | twenty.5 | 130 | 325 | 22 | 102 | a hundred twenty five | five.five | six.five | F10 / F12 | 90 | 19.4 |
FAQ
one Are you a factory or buying and selling business?
We are a factory specialised in production valves and ftting in excess of ten a long time.We have our own stainless steel foundry in ZheJiang province.
And we have received ISO9001&TS certification of Production and processing of valves and fttings.
2 In which are the primary marketplaces for your items?
We hope to make business with organizations from all in excess of the entire world. And for now, our valves and fttings have
Been exported to specially in North The united states, South The united states, South Asia, Europe and Middle East.
three Do you have a minimum amount of the products?
No, we will build company with you with even 1PC. We feel this cooperation will be a long- expression romantic relationship for our large good quality, competitive value and good following-sale service.
4 Are samples obtainable to be sent with free?
It is dependent on what solution you want. There are hundreds of items we promote. You can get in touch with us for particular answer.
5 Can you print our Brand on the valves?
Of course, we can entirely make items in accordance to your particular ask for, even manufacture it foundation on your drawing.
6 What is your lead time?
It is all around fifteen times normally. If we have the goods in stock, it will be about one particular week.
seven what is your payment phrase?
T/T 30% down payment, JCPT to be compensated before shipment.
8 How can I check your factory scenario w hile it’s hard for me to arrive to China?
We have photos and videos on our site and , It exhibits every single step of the producing.
nine How can you assure the high quality of goods?
To start with, we have the numerical management device to manufacture merchandise correctly. Then our top quality inspectors will take a look at products a single by 1 to make positive every valve or ftting we offer is qualified and launch the check mill certificate. If achievable, We can also send you the sample for checking. Regarding the particulars, we can examine if you want to know far more about it.
Jacky
ZHangJCPTG LONGGONG VALVE Engineering CO.,LTD
Mobile:+-1857106221
Cell:+-15857716925
Tel:+-577-86962117
Internet:www.zjlgfm.cn