one.Solution parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany type can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./8.5 |
kingpin | two”/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | 1 |
air wiring | doule air line |
electrical power wiring | six main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting machine reduce the steel to tiny parts use for appropriate welding and splicing
2)welding
right after metal cutting process the next step is welding .this method the major function is beam welding .the best plate-base plate and the
middle plate will be welding collectively . this method will be use submerged arc welding method.this type of welding is really
specific .its exclusively utilized in I beam welding .after this welding approach other components of the trailer will be use different welding way
for various metal-argon arc welding-electric powered arc welding-guide welding-gas welding and so on
three)blasting
this procedure is use for the very first stage of surface area cleanness-stress aid-derusting before paiting .
4)electrophoresis coating
this procedure use for more depth surface area cleanness
5)epoxy zinc primer spray coating
this method is the long lasting one particular prior to paiting .following this procedure the trailer an be paiting
six)assembly
soon after all the process we have mationed .the last method of the trailer is assembly.this procedure all the components will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake technique and so on
7)packing
The final procedure is packing .all the trailer use different packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer