1.Product parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany sort can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./8./8.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | one |
air wiring | doule air line |
electrical energy wiring | 6 core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma cutting equipment minimize the metal to minor areas use for suited welding and splicing
two)welding
right after steel chopping procedure the subsequent stage is welding .this approach the main operate is beam welding .the best plate-bottom plate and the
middle plate will be welding collectively . this approach will be use submerged arc welding procedure.this kind of welding is extremely
unique .its solely used in I beam welding .right after this welding method other components of the trailer will be use diverse welding way
for distinct steel-argon arc welding-electrical arc welding-guide welding-gas welding and so on
three)blasting
this process is use for the very first phase of surface area cleanness-anxiety reduction-derusting before paiting .
four)electrophoresis coating
this approach use for more depth surface cleanness
5)epoxy zinc primer spray coating
this process is the long lasting 1 just before paiting .right after this approach the trailer an be paiting
6)assembly
soon after all the process we have mationed .the very last treatment of the trailer is assembly.this process all the areas will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake method and so on
7)packing
The final process is packing .all the trailer use distinct packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer