one.Product parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany sort can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/9./8./8.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | one |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma slicing device minimize the metal to small elements use for suitable welding and splicing
2)welding
right after metal chopping approach the subsequent action is welding .this method the major function is beam welding .the prime plate-bottom plate and the
middle plate will be welding collectively . this approach will be use submerged arc welding approach.this variety of welding is really
specific .its solely used in I beam welding .soon after this welding approach other areas of the trailer will be use distinct welding way
for different steel-argon arc welding-electric arc welding-handbook welding-fuel welding and so on
3)blasting
this method is use for the initial stage of surface area cleanness-anxiety aid-derusting just before paiting .
four)electrophoresis coating
this procedure use for more detail floor cleanness
five)epoxy zinc primer spray coating
this method is the long lasting one particular prior to paiting .following this procedure the trailer an be paiting
6)assembly
after all the method we have mationed .the last process of the trailer is assembly.this method all the elements will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake technique and so on
seven)packing
The previous procedure is packing .all the trailer use various packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer