1.Solution parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany sort can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./eight./eight.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | 1 |
air wiring | doule air line |
electrical energy wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma reducing machine cut the metal to small parts use for suitable welding and splicing
two)welding
soon after metal chopping process the next action is welding .this method the major perform is beam welding .the leading plate-bottom plate and the
middle plate will be welding collectively . this approach will be use submerged arc welding process.this kind of welding is extremely
specific .its solely used in I beam welding .right after this welding process other areas of the trailer will be use diverse welding way
for various metal-argon arc welding-electric powered arc welding-guide welding-gasoline welding and so on
three)blasting
this approach is use for the very first stage of area cleanness-tension relief-derusting ahead of paiting .
4)electrophoresis coating
this procedure use for more depth floor cleanness
five)epoxy zinc primer spray coating
this procedure is the lasting 1 ahead of paiting .following this process the trailer an be paiting
six)assembly
soon after all the approach we have mationed .the last procedure of the trailer is assembly.this method all the components will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake system and so on
seven)packing
The previous process is packing .all the trailer use distinct packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer