1.Solution parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany type can be opentional |
tire | 11R22.5/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./eight./eight.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | one |
air wiring | doule air line |
electrical energy wiring | six main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting equipment minimize the metal to minor areas use for appropriate welding and splicing
2)welding
soon after steel slicing procedure the next action is welding .this procedure the principal work is beam welding .the best plate-bottom plate and the
middle plate will be welding jointly . this procedure will be use submerged arc welding procedure.this variety of welding is quite
particular .its solely employed in I beam welding .soon after this welding process other areas of the trailer will be use distinct welding way
for different metal-argon arc welding-electric powered arc welding-manual welding-gas welding and so on
three)blasting
this process is use for the first step of surface area cleanness-tension reduction-derusting prior to paiting .
4)electrophoresis coating
this process use for far more element area cleanness
five)epoxy zinc primer spray coating
this approach is the long lasting 1 just before paiting .following this process the trailer an be paiting
six)assembly
after all the process we have mationed .the final treatment of the trailer is assembly.this approach all the components will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake system and so on
seven)packing
The very last method is packing .all the trailer use different packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer