one.Product parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany kind can be opentional |
tire | 11R22.five/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/nine./8./eight.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | one |
air wiring | doule air line |
electricity wiring | six core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma slicing device reduce the steel to small components use for suited welding and splicing
2)welding
after metal reducing process the next action is welding .this process the main operate is beam welding .the prime plate-bottom plate and the
middle plate will be welding together . this method will be use submerged arc welding approach.this sort of welding is really
unique .its exclusively used in I beam welding .soon after this welding procedure other elements of the trailer will be use diverse welding way
for various steel-argon arc welding-electric arc welding-handbook welding-fuel welding and so on
3)blasting
this method is use for the first stage of area cleanness-tension aid-derusting prior to paiting .
4)electrophoresis coating
this procedure use for a lot more element floor cleanness
5)epoxy zinc primer spray coating
this procedure is the long lasting one just before paiting .following this process the trailer an be paiting
six)assembly
soon after all the approach we have mationed .the last procedure of the trailer is assembly.this method all the elements will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake method and so on
seven)packing
The very last approach is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer