1.Item parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany type can be opentional |
tire | 11R22.5/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./eight./8.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
device box | one |
air wiring | doule air line |
electrical energy wiring | 6 core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing machine lower the metal to minor components use for suited welding and splicing
2)welding
following metal reducing method the next action is welding .this process the principal operate is beam welding .the prime plate-base plate and the
middle plate will be welding collectively . this approach will be use submerged arc welding method.this kind of welding is very
special .its solely utilized in I beam welding .after this welding approach other areas of the trailer will be use diverse welding way
for different steel-argon arc welding-electric arc welding-guide welding-gasoline welding and so on
three)blasting
this approach is use for the first step of floor cleanness-tension aid-derusting before paiting .
four)electrophoresis coating
this procedure use for more element surface area cleanness
5)epoxy zinc primer spray coating
this process is the long lasting one prior to paiting .following this method the trailer an be paiting
six)assembly
after all the procedure we have mationed .the previous treatment of the trailer is assembly.this method all the parts will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake technique and so on
seven)packing
The last method is packing .all the trailer use distinct packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer