one.Solution parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany variety can be opentional |
tire | 11R22.5/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./eight.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
device box | one |
air wiring | doule air line |
electric power wiring | six core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting equipment reduce the steel to tiny areas use for suitable welding and splicing
2)welding
following metal chopping method the following action is welding .this process the main operate is beam welding .the leading plate-bottom plate and the
middle plate will be welding together . this approach will be use submerged arc welding approach.this kind of welding is extremely
specific .its completely employed in I beam welding .after this welding approach other areas of the trailer will be use diverse welding way
for different steel-argon arc welding-electrical arc welding-guide welding-gasoline welding and so on
three)blasting
this procedure is use for the very first step of area cleanness-stress relief-derusting before paiting .
four)electrophoresis coating
this method use for a lot more depth area cleanness
five)epoxy zinc primer spray coating
this approach is the long lasting a single before paiting .following this process the trailer an be paiting
6)assembly
after all the procedure we have mationed .the last process of the trailer is assembly.this method all the components will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake program and so on
seven)packing
The very last approach is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer