one.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany kind can be opentional |
tire | 11R22.5/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/nine./eight./8.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
device box | one |
air wiring | doule air line |
electricity wiring | six main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting machine reduce the steel to minor areas use for appropriate welding and splicing
two)welding
following steel slicing method the next step is welding .this process the major operate is beam welding .the top plate-base plate and the
middle plate will be welding collectively . this process will be use submerged arc welding approach.this type of welding is extremely
particular .its completely used in I beam welding .soon after this welding procedure other parts of the trailer will be use distinct welding way
for various steel-argon arc welding-electrical arc welding-handbook welding-gasoline welding and so on
three)blasting
this procedure is use for the very first phase of surface cleanness-tension reduction-derusting ahead of paiting .
four)electrophoresis coating
this approach use for more element area cleanness
5)epoxy zinc primer spray coating
this process is the lasting one particular ahead of paiting .after this procedure the trailer an be paiting
6)assembly
right after all the procedure we have mationed .the very last treatment of the trailer is assembly.this approach all the areas will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake method and so on
seven)packing
The previous approach is packing .all the trailer use different packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer